In short

Electrical submetering means installing power analysers in distribution boards to know the consumption of each line, machine or section, not just the meter total. The data travels over a bus such as Modbus to a dashboard showing consumption, power and peaks. It is used to allocate costs, detect out-of-shift consumption and justify investments.

What should be measured first?

There is no need to measure everything from day one. The incomer and the four or five biggest consumers already explain most of the bill.

  • The main incomer, to check against the bill.
  • The big consumers: compressors, HVAC, ovens and industrial refrigeration.
  • Each production line or section, if costs are to be allocated.
  • Lighting, separately.
  • Base load: what stays on at night and at weekends.

Which equipment is used?

For internal use an analyser of a suitable class is enough. If the measurement is used to bill a third party, such as a tenant, a MID-certified meter is required.

Equipment in a submetering installation
EquipmentFunctionBear in mind
Power analyserMeasures energy, power, voltage, current and power factorDIN-rail or panel-door mounted
Current transformersAdapt the line current to the analyserSplit-core types fit without disconnecting the cable
Communication busCarries the data (Modbus RTU or TCP)One cable runs through the boards; network and radio units also exist
Gateway or data loggerCollects and sends the dataStores data if the connection is lost
DashboardShows consumption, peaks, comparisons and reportsWith threshold alerts

What decisions does it enable?

  • Switching off what consumes without producing: idling compressors, HVAC at night, lines on standby.
  • Staggering start-ups to lower power peaks.
  • Watching reactive energy and demand overruns, which are charged separately on the bill.
  • Comparing shifts, lines or sites against one reference, such as consumption per unit produced.
  • Checking with data whether an investment delivered the expected saving.
  • Providing records for an energy management system such as ISO 50001.

How is it installed without stopping the plant?

Split-core transformers clamp around the cable without disconnecting it, and the analyser fits in a free space in the board. The analyser’s voltage connection does require electrical work with the corresponding safety measures, planned board by board. Where running the bus is not worthwhile, radio-linked units are used.

Frequently asked questions

Does every machine need to be measured?

No. Start with the incomer and the big consumers, and add points only where the data will be used to decide something.

How accurate is this equipment?

It is set by the class of the analyser and the transformers. A standard class is enough for internal management; billing third parties requires MID certification.

Can the data be viewed alongside production data?

Yes. If the machines provide unit counters, the dashboard can show consumption per unit produced.

Where is the data stored?

On a company server or an external platform, as you prefer. In both cases the gateway should store data if the connection drops.

Contact

Shall we talk about your project?

Tell us what you need and what stage you are at. We will get back to you to arrange a site survey or a proposal.

+34 605 660 658 info@domoticavalencia.es Valencia and metropolitan area