A large store’s technology must be planned with the works: containment and racks before ceilings close, certified cabling for tills, offices and stockroom, WiFi for operations and customers, cameras and alarm live before stock arrives, screens with scheduled content and lighting and climate control by schedule, all tested and documented before opening.
Before the works
- Gather the chain’s technical standards: equipment, labelling and required documentation.
- Place the main and secondary racks on the drawings, with their cooling and UPS needs.
- Define network points for tills, offices, stockroom, screens, access points and cameras.
- Order the internet line and a backup connection early.
During the works
- Containment and trays before false ceilings are closed.
- Cabling and fibre splicing; certification of every point.
- Screen and camera mounts coordinated with the interior design.
- Power for screens, racks and control equipment.
Before opening
- Cameras and alarm live before stock arrives.
- WiFi verified with a real coverage survey, with the store fitted out.
- Screens with scheduled content and power-on times.
- Lighting and climate schedules configured.
- Staff training and documentation handover: drawings, certificates, passwords stored securely.